Click pictures for a larger view.

Stations 1 -
4: Floor Department

Purchased Frame Inspection

Serial Number Applied

Bottom Board Installed

Perimeter Rail Installed

Borate Floor Joists Installed 16" On Center
Heat Duct Installed
Water Lines installed

Insulation Installed in Floor

3/4" Plywood Decking Installed

Moisture Barrier Installed between Sub-floor and Finished Floor

3/4" Natural Red Oak Hardwood Floors Installed

Both Sub-Floor and Finished Floor are 3/4"

Vinyl Flooring and Carpet Installed

Return Air Location Cut in Floor

Start Above Floor Plumbing

Air Vents Installed in Floor

Finished in the Floor Department
Stations 5 -
8: Interior and Exterior Wall Department

Interior Wall Set
Install Tub / Shower

Exterior Walls Constructed on Wall
Table


Interior Walls Set First, then Exterior Walls


Walls Insulated

Ready to go to Roof Department
Stations 9 -
12: Roof Department

Roof
Built, Engineered Trussed
Rafter System, 16" On Center

Roof Installed

Loft Being Built

Roof Insulated Awaiting OSB
Sheathing
Stations 13:
Exterior Sheathing Department

OSB Sheathing Installed

House Wrap Installed Prior to Finished Exterior Placement
Stations 14:
Windows & Doors Department

Install Doors

Install Windows
Stations 15 -
16: Exterior Siding Department

Finished Exterior Placement


Log Exterior Stained, Sealed and
Caulked

Installed Exterior Siding

Roof Shingles or Metal Installed

A Look Down the Production Line
Stations 17 -
24: Interior Trim, Cabinet Set and Final Inspection Departments


Cabinets Produced in our Custom Cabinet Shop

Install Cabinets


Set / Install Water Heater

Exterior Labels Installed So Water Hook-Ups, Gas Hook-Ups, etc.
Clearly Marked

Floor Registers Installed

Panel Box Complete and Labeled, Cabinet Door Installed Over

Finish Electrical Receptacles, Switches and Covers

Recessed Lighting Installed

Install Cabinet Doors

Install Closet Mirror Doors

Install Smoke Detector

Install Appliances

Ceiling Fan Installed

Install Towel Bar

Install Shower Rod and Curtain

Install Toilet Paper Holder

Install Drapery Package


Additional Options Installed

Exterior Shutters Installed

Exterior Water Spigot Installed

Affix Third Party Plate

Affix Data Plate

Final Inspection by General Manager / Ready to Ship to Customer
|